Airport Layout Plan


A comprehensive Master Plan Update is in progress.  The report includes all the required elements of a typical airport master plan and layout plan update and described planned improvements throughout the 2035 planning horizon.

Numerous projects are currently underway to accommodate increased demand for general aviation services at LEE, including the extension of Taxiway A to the airport property line, the seaplane ramp, and the floating seaplane dock. 

In May 2013, an Interim ALP Update and Narrative Report was prepared. This Interim ALP Update is consistent with the most current Federal Aviation Administration and the Florida Department of Transportation guidelines.